-
A Yes, We accept. OEM and ODM can be customized, etc., We can customize according to drawings and data, and update production data at the same time, and send bulk samples and proofing samples.welcome to consult !
-
A Yes, each product is different, and our quality certification and third-party reports are pre-shipment inspections of previous customer shipments.
-
A Of course, we welcome customers or quality inspection factories at any time.
-
A We can provide technical support to customers.
-
A Yes, we support after-sales service, and our products are usually guaranteed for 18 months.
-
A Yes, we do, because of the special nature of the product. We can support FOB, CIF and DDU, DDP and other trade methods.
DDP is only suitable for some countries. Most of them are CIF transactions.
-
A Professional Packaging:
Household wires are packaged using moisture-proof plastic film to ensure the cables remain undamaged during long-distance transportation.
Reinforced Protection:
For large cable reels, we use sturdy wooden or steel drums for reinforcement to prevent damage from collisions or pressure during transport. Waterproof joints are applied at cable ends to further protect against moisture.
Protective Measures:
Inside the container, we reinforce packaging with straps, triangular wooden blocks, and long wooden beams to secure the cables, particularly during sea transport, to prevent movement and impact.
Transport Monitoring:
We collaborate with reliable logistics partners to provide full transport monitoring, ensuring the cables remain in controlled conditions throughout the shipping process.
Third-Party Inspection:
Upon customer request, we can arrange for third-party inspections before shipment to verify that product quality and packaging meet international standards.
-
A What transportation services do you provide? Can you arrange sea or rail transportation?
We can provide air transportation, sea transportation, road transportation and railway transportation etc.
-
A The delivery time for MOQ quantity is about 10-15 days, and for large quantity it will take about 35-60 days.
-
A We support bank card payment and letter of credit payment. For some large cable projects, we can discuss Sinosure in detail.